Heat recovery system for biomass boiler 1.100 kW

Following reconstruction steps are proposed due to determined system conditions and to changed framework conditions:

  • 2-mode air preheater with STAINLESS STEEL STRAIGHT-TUBE AIR PREHEATER
  • Additional stainless steel straight-tube bundle for low temperature circuit
  • Replacement of the process water treatment
  • Replacement of the control cabinet
     

Scope of delivery:

  • Air preheater (LUVO) with heat exchanger tubes made of 1.4462

  • Heat exchanger with casing made of 1.4571

  • Flue gas compensator, piping and duct parts

  • Heat capacity LUVO 222 kW (w35, -10°C outside)

  • Disassembly of old stock

  • Installation of a hot air generation without de-pluming

  • Modification of the control cabinet

  • Additional visualisation

  • Assembly

  • Engineering (process engineering, design engineering)

  • Start-up in October 2013

Contactform

Contact

Contact

For further information about our solutions and services contact us via the following form.

You can also contact us via phone +43771350260 or email office@remove-this.heger-edelstahl.at.

All fields marked with (*) are required.
+43 7713 50260